地暖安装要求及安装步骤 - 济南地暖价格多少钱
欢迎访问济南朗坤暖通工程淅江福彩网网站!!!

地暖安装要求及安装步骤

来源:http://www.ycepec.com/ 发布时间:2018/04/18

水暖地暖是以不高于60℃的低温水作为热媒并使其科学分布于地面层下的热水盘管,均匀辐射加热整个地面,是以整个地面为散热面,通过地暖管网辐射层中的热媒,均匀加热整个地面,利用地面自身的蓄热量向房间各个角度辐射热量,来达到取暖的目的。
Warm water heating is a hot water coil which is used as heat medium at low temperature of 60 degrees centigrade and makes its science distributed under the ground layer. The whole ground is heated by uniform radiation. It is the heat medium on the whole ground. Through the heat medium in the radiant layer of the heating pipe network, the whole ground is heated evenly, and the heat storage of the ground surface itself is used to the various angles of the room. Heat the heat to achieve the purpose of heating.
地暖施工流程第一步:整平地面并清理干净整平地面是安装地暖的先决条件,如果地面不平不仅会影响地暖保温,甚至如果有尖利的东西,还会划破地暖管,地面整平要先将地面凹凸处剔除找平至±10mm地面上杂物等清理干净保证地面平整,墙、柱脚与地面呈90度直角。
The first step of ground heating construction process: leveling the ground and clearing the ground clean and leveling the ground is a prerequisite for the installation of ground heating. If the uneven ground will not only affect the thermal insulation of the ground, even if there is a sharp point, the ground will be broken, and the ground leveling should first be removed to the surface of the ground to clean up the debris and so on on the 10mm ground. For ground leveling, wall column, a 90 degree angle with the ground.
地暖施工流程第二步:安装总控系统将分集水器水平安装于图纸指定位置,分水器在上集水器在下,间距200mm。集水器中心距地面高度不小于30cm安装牢固。安装主管道时应保持3坡度,隔一定距离安装固定支架或掉卡。
The second step of the floor heating construction process is to install the general control system and install the diversity water level in the designated position of the drawing, and the distributor is on the upper water collector, and the spacing is 200mm. The height of the collector is not less than 30cm, and the installation is firm. When installing the main pipe, 3 slopes should be maintained, and fixed supports or cards should be installed at a distance.
地暖施工流程第三步:铺设保温层、反射膜及钢丝网铺设绝热层之前,先做一层防潮层,然后铺设保温板反射膜及钢丝网。在找平层上铺设保温层,板缝处用胶粘贴牢固,在地暖保温层上铺设铝箔纸或粘一层带坐标分格线的复合镀铝聚脂膜,保温层要铺设平整。保温板铺设好之后,铺设反射膜,为了防止热量向下流失,运用铝箔反射膜铺设的一层保护层。
The third step of ground heating construction process: before laying insulation layer, reflection film and steel wire network laying insulation layer, a layer of moistureproof layer is first made, and then the reflective film and wire mesh of insulation board are laid. The insulation layer is laid on the leveling layer, the seam is sticked firmly with glue, the aluminum foil paper is laid on the thermal insulation layer or the composite aluminum coated polyaluminum film with coordinate grid line is attached to the thermal insulation layer, and the insulation layer should be laid flat. After laying the insulation board, the reflective film is laid. In order to prevent the heat from going down, a protective layer is laid on the foil reflector.
我们一直以质量第一,顾客至上,作为我们的服务宗旨,尽我们最大的努力来为您提供满意的服务,我们真诚的欢迎您来本公司视察,选购,希望我们有良好的合作机会,共同创造双赢的局面!
We have always been with the quality first, customer first, as our service tenet, our best efforts to provide you with satisfactory service, we sincerely welcome you to this company inspection, selection, hope that we have a good opportunity to cooperate to create a win-win situation together!
上海福彩网 湖南福彩网 上海福彩网 上海福彩网 辽宁福彩网 江苏福彩网 江苏福彩网 江苏福彩网 辽宁福彩网 淅江福彩网